The November 10th Open house is in full swing.  We have 11 of our dozen layouts and attractions open and running today. Missing is the ride-on train. We’re all volunteers here, and some weekends we simply don’t have the personnel to operate the big train safely.  The 7 1/2” gauge train requires an engineer, a conductor (at the rear) a station master and a flag person to stop driveway traffic.